Physics integrates motion every 5 ms
The Newton solver advances motion and contact at 200 Hz. The BAM servo model acts within this physics loop. Its 3–6-step command delay corresponds to 15–30 ms.
Select a step or labeled object to explore it. Use Enter or Space from the keyboard; Esc clears the explanation. On a small screen, scroll the diagram sideways.
Select a step or object for its explanation.
The Newton solver advances motion and contact at 200 Hz. The BAM servo model acts within this physics loop. Its 3–6-step command delay corresponds to 15–30 ms.
Decimation 4 means one policy action for four physics steps. The 14 requested offsets stay in effect while the actuator model and physics evolve. This interval measures simulated time; wall-clock inference latency is measured separately.
Each environment contributes 24 transitions before an update: 24 × 0.02 = 0.48 simulated seconds. With 4,096 environments the batch contains 98,304 transitions. Proximal policy optimization (PPO) revisits this batch during optimization; the elapsed wall-clock time depends on hardware and workload.
The time limit is 1,000 control steps. Falling or an invalid state can end the episode earlier. A 24-step rollout normally ends before the episode does, so the critic estimates the remaining value at the rollout boundary.