NVIDIA Mission Control North-South Network GB200/GB300 Deployment Guide - External#
Contents:
- Introduction
- Networking Planning and Design
- Configure Cluster Ethernet Networking
- Summary
- USB Preparation
- GB200/GB300 Rack Inventories Workflow
- Manual Process
- Stage1: Pre-stage the IP Plan via subnetting calculator
- Option 1: To provision the Ethernet Switch manually
- Option 2: Provision your Ethernet Switch using BCM through the ZTP process
- Choose your option:
- NO bcm-netautogen, YES bcm-pod-install:
- NO bcm-netautogen, NO bcm-pod-install
- Set up the Access OOB Switch
- Ethernet Cluster Networking Validation
- NVLink Switch Planning and Design
- Appendix: Configuration Examples
- Section 1: OOB (example)
- Section 2: TOR (example)
- BTOR-0[1-2] Basic (Border Leaf)
- BTOR-0[x-y] CONTROLNODE BONDING
- BTOR-01 SVI
- BTOR-02 SVI
- BTOR-0[1-2] EVPN/VXLAN/RoCE
- BTOR-0[1-2] BGP VRF
- BTOR-0[1-2] BGP EDGE
- BTOR-0[1-2] POLICY
- BTOR-0[1-2] to SPINEs
- BTOR-0[1-2] DHCP-Relay
- BTOR-0[1-2] STORAGE VRF
- BTOR-0[1-2] POLICY 2
- Inband Policy Inserts Default Route
- Connection Towards Customer
- Aggregate Summary Routes towards Edge
- Section 3: GB200/GB300 Rack Inventory (Example)