Installation and Configuration
The following steps include illustrations that show front side (ports) installation, yet all instructions apply to all installation options.
# | Illustration |
1 | Mount the systems rails (Part E) onto the chassis:
|
2 | Install 8 captive nuts (Part A, round or square), as shown in the illustration: |
3 | Mount the rack rails (Part D) onto the rack using screws B (2 screws per side): *Do not tighten the screws yet. |
4 |
*Route the required cables through the designated window (right/left/both). Plug the cables. |
5 |
|
Connector (Front) SideQM9700 QM9790 |
FRU (Rear) Side* It may take up to five minutes to turn on the system. ** Certain systems have a single management port. |
* It may take up to five minutes to turn on the system. If the System Status LED shows red/amber after five minutes, unplug the system and contact your NVIDIA representative.
LED Assignments
Symbol | Description | Normal Status |
System health | Green/Flashing | |
Fan health | Green | |
Power supply health | Green | |
Identifier LED | Off/Blue | |
Reset button |
Connect the host PC to the Console (RJ-45) port.
Configure a serial terminal program.
Parameter
Settings
Baud rate
115200
Data bits
8
Stop bits
1
Parity
None
Flow control
None
Login:
OS
Username
Password
Onyx (MLNX-OS)
admin
admin
Initial configuration in Onyx (MLNX-OS): Go through the configuration wizard. For further information, please refer to: https://docs.nvidia.com/networking/category/mlnxos.
For full installation instructions, go to https://docs.nvidia.com/networking/display/QM97X0PUB.