SN2010 1U Ethernet Switch Systems Quick Installation Guide

SN2010 1U Ethernet Switch Systems Quick Installation Guide

worddavf7011ad91d8a8ea9c18418ff4fbb3038-version-1-modificationdate-1709645234630-api-v2.png

Pay Attention!

  • All servers and systems in the rack should be planned with the airflow direction. All FRU components must have the same air flow direction. A mismatch in the air flow will affect the heat dissipation.

Package Contents

  • 1 x System

  • 2 x Power cables – Type C13-C14

  • 1 x Harness RS232 2M cable – DB9 to RJ-45

The following items are not included in the SN2010 package, and can be purchased separately:

  • Rack installation kit for SN2010 series short depth 1U switches, allows installation of one switch into standard depth racks (23.6"-31.5"/600-800mm)

  • 8 x Cable ties

Quantity

Item

X30 - For Side-by-Side Installation

X15 - For a single switch

worddaveea9790b3b04ae1c621e6e6ed2da25b0-version-1-modificationdate-1709645233383-api-v2.png

X10 (of each)

worddav564908a700fbca60363ffa27ec6d2e61-version-1-modificationdate-1709645233853-api-v2.png

worddav8a5a67af10ca4fe0376912f9fc6f36f3-version-1-modificationdate-1709645233080-api-v2.png

X2 (of each)

image2022-3-1_9-31-27-version-1-modificationdate-1709645223487-api-v2.png

1X

worddavb84a150fc2c50fe166f22ea692fcccb0-version-1-modificationdate-1709645232773-api-v2.png

X1

image2022-3-1_9-34-2-version-1-modificationdate-1709645223043-api-v2.png

X2

image2022-3-1_9-34-19-version-1-modificationdate-1709645222600-api-v2.png

X8

worddav8a408952804c005bb5d273626acb654d-version-1-modificationdate-1709645231170-api-v2.png

If anything is damaged or missing, contact your NVIDIA representative at Networking-support@nvidia.com.

© Copyright 2023, NVIDIA. Last updated on Mar 7, 2024.