QM8700 and QM8790 InfiniBand Switch Systems Quick Installation Guide

images/ee41c2793a1545f85050e4a3abffb30389c63ea9268b47c2065b375e156663e2.dat

Models: QM8700, QM8790

Pay Attention!

  • At least two people are required to safely mount the system in the rack.

  • All servers and systems in the rack should be planned with the airflow direction. All FRU components must have the same air flow direction. A mismatch in the air flow will affect the heat dissipation.

  • The part of the system to which you choose to attach the rails will determine the system's adjustable side. The system's part to which the brackets are attached will be adjacent to the cabinet.

  • The FRU side is extractable. Mounting the rack brackets inverted to the FRU side will allow you to slide the FRUs, in and out.

Package Contents (System and Rail-Kit)

  • 1 x System

  • 1 x Fixed rail kit for 16.9-31.5" (430-800mm) racks

  • 2 x Power cables – Type C13-C14

  • 1 x Harness: HAR000631 – Harness RS232 2M cable – DB9 to RJ-45 (only in QM8700)

  • 2 x Cable retainers

Quantity

Item

X4

A images/e5c30b9bb6de2bb1bfc63ab7d773e2170b3847b7245e625f097f4732d46d5147.dat

X8 (of each)

B, Cimages/ad4fd047f00f1fda4644a783e6888230def8927ee59ea3bc9185ee40fde58211.dat

X2 (of each)

D, E, F

images/bf08fdcdee69549d0badd0786493f2b351b6755e01a53a2cd67fb7a089006a16.dat

X2

images/8775b18da8d3250ddac5c50590396b96433e0033bbb31d6b02f6d6075f145665.dat

X1

images/81ecad5c19470fa46930fd64e312c36d8df3e5574845c4cdb69ff8bb83935ba3.dat

X2

images/058a4aa50c7cf00784e3093b8a5ae70fb5d2dd14156bfd592aa2f1cda8f984d1.dat

If anything is damaged or missing, contact your NVIDIA representative at Networking-support@nvidia.com.

© Copyright 2023, NVIDIA. Last updated on May 22, 2023.