Installation and Configuration
The following steps include illustrations that show front side (ports) installation, yet all instructions apply to all installation options.
# |
Illustration |
1 |
Extract the system rail (Part A):
![]() |
2 |
Mount the systems rails (Part A) onto the chassis:
|
3 |
Install the rack rails (Part B) on the rack.
|
4 |
Mount the chassis onto the rack. Note
At least two people are required to safely mount the system in the rack.
|
Connector (Front) SideQM9700 ![]()
QM9790 ![]()
|
FRU (Rear) Side* It may take up to five minutes to turn on the system. If the System Status LED shows amber after five minutes, unplug the system and contact your NVIDIA representative. ** Certain systems have a single management port. |
* It may take up to five minutes to turn on the system. If the System Status LED shows red/amber after five minutes, unplug the system and contact your NVIDIA representative.
LED Assignments
Symbol |
Description |
Normal Status |
![]()
|
System health |
Green/Flashing |
![]()
|
Fan health |
Green |
![]()
|
Power supply health |
Green |
![]()
|
Identifier LED |
Off/Blue |
![]()
|
Reset button |
Connect the host PC to the Console (RJ-45) port.
Configure a serial terminal program.
Parameter
Settings
Baud rate
115200
Data bits
8
Stop bits
1
Parity
None
Flow control
None
Login:
OS
Username
Password
Onyx (MLNX-OS)
admin
admin
Initial configuration in Onyx (MLNX-OS): Go through the configuration wizard. For further information, please refer to: https://docs.nvidia.com/networking/category/mlnxos.
For full installation instructions, go to https://docs.nvidia.com/networking/display/QM97X0PUB.