Installation and Configuration
# |
Illustration |
1 |
Attach parts D and E (x2 of each) to the switch. Push the switch chassis' pins through the slider key holes, until locking occurs. Pay attention to the rack's type. Short racks (430-580mm):
|
Standard racks (580-800mm):
|
|
2 |
Short racks:
|
Standard racks:
|
|
3 |
Install 8 cage nuts (B) in the desired 1U slots of the rack.
|
4 |
Do not tighten the screws yet.
|
5 |
|
6 |
Tighten all M6 screws (C) with a torque of 4.5±0.5.
|
If anything is damaged or missing, contact your NVIDIA representative at Networking-support@nvidia.com.
Connector (Front) Side
|
FRU (Rear) Side QM8790 Front View
QM8700 and QM8790 Rear View
|
* It may take up to five minutes to turn on the system. If the System Status LED shows red/amber after five minutes, unplug the system and contact your NVIDIA representative.
Symbol |
Description |
Normal Status |
|
System health |
Green/Flashing |
|
Fan health |
Green |
|
Power supply health |
Green |
|
Identifier LED |
Off/Blue |
|
Reset button |
Connect the host PC to the Console (RJ-45) port.
Configure a serial terminal program.
Parameter
Settings
Baud rate
115200
Data bits
8
Stop bits
1
Parity
None
Flow control
None
Login:
OS
Username
Password
Onyx (MLNX-OS)
admin
admin
For initial configuration in Onyx (MLNX-OS): Go through the configuration wizard. For further information, please refer to: https://docs.nvidia.com/networking/software/switch-software/index.html.
For full installation instructions, go to https://docs.nvidia.com/networking/switches/index.html.