NVIDIA Mission Control Management Plane and Rack Setup with NVIDIA GB200 NVL72 Systems Installation Guide#
Installation Guide
- Introduction
- BCM Software Installation
- BCM Networking Setup
- Configuration for Node Provisioning
- High Availability
- GB200/GB300 Rack Power On and Bring Up
- GB200/GB300 Rack Firmware Update
- Deployment Summary Validation Checklist
- Prerequisites and Hardware Validation
- BCM Software Installation Validation
- Network Configuration Validation
- Software Image and Category Validation
- Control Plane Node Configuration Validation
- UFM Pre-Setup Validation
- GB200/GB300 Rack Configuration Validation
- High Availability Configuration Validation
- Rack Power-On and Provisioning Validation
- Firmware Update Validation
- System Integration and Final Validation
- Documentation and Handover
- Performance Validation
- Final System Acceptance
- Commands for Quick Final Validation
- Critical Success Criteria
- Appendix
- Understanding Netnames
- Hardware Information Gathering
- Other Tips and Tricks
- Check the DGX OS packages to meet current SBOM
- Creating a RAID 1 Software Partition
- Switching the Network Mode for CX-7/BF3 Cards
- Accessing GB200 Compute Tray using Minicom (USB to Micro-USB Connection)
- Set Jump host using Firefox and Foxy Proxy
- Jailbreak a UFM Appliance
- Updating the GB200/GB300 compute tray Bluefield 3 Option ROM
- KVM Setup on Ubuntu