SB77X0 SB78X0 SB67X0 and SX6710G InfiniBand Switch Systems Quick Installation Guide

worddavf8516f0be1c88571a2741f6049d97d46.png

Models: SB7700, SB7780, SB7790, SB7890, SB7800, SX6710, SX6710G, SX6720

Pay Attention!

  • At least two people are required to safely mount the system in the rack.

  • All servers and systems in the rack should be planned with the airflow direction. All FRU components must have the same air flow direction. A mismatch in the air flow will affect the heat dissipation.

  • The part of the system to which you choose to attach the rails will determine the system's adjustable side. The system's part to which the brackets are attached will be adjacent to the cabinet.

  • The FRU side is extractable. Mounting the rack brackets inverted to the FRU side will allow you to slide the FRUs, in and out.

Package Contents

  • 1 x System

  • Rail Kit for short depth (17"24" / 432-610mm) or standard depth (24" 34" / 610-863mm) racks

  • 2 x Power cables – Type C13-C14

  • 1 x Harness RS232 2M cable – DB9 to RJ-451 (included in SB7X00, SB7780 and SX67X0 only)

  • 1 x Harness CAT6A 2M – RJ-45 to RJ-45 cable

  • 2 x Cable retainers

Quantity

Item

X4


worddaveea9790b3b04ae1c621e6e6ed2da25b0.png

X8 (of each)

worddav564908a700fbca60363ffa27ec6d2e61.png

X2 (of each)

worddav29916e6196644c24c046ab77d2deb2d0.png

X2

image2022-3-1_15-48-15.png

X2

image2022-3-1_8-42-8.png

X2

image2022-3-1_15-49-17.png

If anything is damaged or missing, contact your NVIDIA representative at Networking-support@nvidia.com.

© Copyright 2023, NVIDIA. Last updated on May 22, 2023.