TQ8X00 InfiniBand Switch Systems Quick Installation Guide

worddav31fc4e64ed6df1be570725b6005033d6.png

Models: TQ8100, TQ8200

Pay Attention!

  • At least two people are required to safely mount the system in the rack.

  • All servers and systems in the rack should be planned with the airflow direction. All FRU components must have the same air flow direction. A mismatch in the air flow will affect the heat dissipation.

  • The part of the system to which you choose to attach the rails will determine the system's adjustable side. The system's part to which the brackets are attached will be adjacent to the cabinet.

  • The FRU side is extractable. Mounting the rack brackets inverted to the FRU side will allow you to slide the FRUs, in and out.

Package Contents

  • 1 x System

  • 1 x Fixed rail kit for 16.9-31.5" (430-800mm) racks

  • 2 x Power cables – Type C13-C14

  • 1 x Harness: HAR000631 – Harness RS232 2M cable – DB9 to RJ-45

  • 2 x Cable retainers

    Quantity

    Item

    X4


    A

    worddaveea9790b3b04ae1c621e6e6ed2da25b0.png

    X8 (of each)

    B, C

    worddav564908a700fbca60363ffa27ec6d2e61.png

    X2 (of each)

    worddav69f628bd185a2a31d0be7b94504908b5.png


    D, E, F

    X2

    image2022-3-1_15-48-15.png

    X1

    image2022-3-1_8-42-8.png

    X2

    image2022-3-1_15-49-17.png

    If anything is damaged or missing, contact your NVIDIA representative at Networking-support@nvidia.com.

© Copyright 2023, NVIDIA. Last updated on May 22, 2023.