SN3420 Ethernet Switch Systems Quick Installation Guide

worddavef68cf22e03ef8807e772a5071251d8e.png

Pay Attention!

  • All servers and systems in the rack should be planned with the airflow direction. All FRU components must have the same air flow direction. A mismatch in the air flow will affect the heat dissipation.

Package Contents

  • 1 x System
  • Rail kit for short depth racks (19.7"-23.6" / 500-600mm) or for standard depth racks (23.6"-31.5" / 600-800mm)
  • 1 x Harness RS232 2M cable – DB9 to RJ-451
  • 2 x Power cables – Type C13-C14
  • 2 x Velcro based cable retainers

QuantityItem
X4A
worddaveea9790b3b04ae1c621e6e6ed2da25b0-version-1-modificationdate-1711536698833-api-v2.png
X8 (of each)B, C
worddav564908a700fbca60363ffa27ec6d2e61-version-1-modificationdate-1711536699387-api-v2.png
X2 (of each)D, E
image2022-3-1_14-52-43.png
X2
image2022-3-1_15-48-15.png
X1
image2022-3-1_8-42-8.png
X2

image.png

If anything is damaged or missing, contact your NVIDIA representative at Networking-support@nvidia.com.

© Copyright 2023, NVIDIA. Last updated on May 22, 2023.