NVIDIA targets one public minor release of Rack Management Service (RMS) each month, with a rolling three-month roadmap refreshed monthly. RMS follows Semantic Versioning, and guaranteed public interfaces remain backward-compatible within an RMS application major version. Each public release follows QA approval.
RMS Versioning
RMS uses Semantic Versioning in the form vX.Y.Z:
Xis the major version. It changes for a release with incompatible changes to guaranteed public interfaces.Yis the minor version. It normally advances with the monthly release and may include new backward-compatible functionality.Zis the patch version. It advances for fixes to an existing minor release.
For example, v0.12.0 is a minor release and v0.12.1 is its first patch
release.
Tags
Release-candidate numbers begin with rc1 and increase whenever the candidate
source or artifacts change. Every RC tag identifies a distinct candidate; tags
are immutable and are never moved or reused. A final release drops the -rcN
suffix while retaining the approved X.Y.Z version.
Monthly release flow
- NVIDIA prepares a versioned release candidate and completes the planned validation for that release.
- QA approves the exact source and artifacts selected for publication.
- NVIDIA opens a public pull request containing the approved release content.
- The pull request completes the required public checks and review.
- NVIDIA merges the pull request and publishes the corresponding final release.
The monthly cadence is a target, not a reason to bypass validation. If the candidate changes after QA approval, NVIDIA creates and validates a new candidate before merging it publicly. A release may therefore move to a later date when additional fixes or validation are required.
Three-month rolling roadmap
RMS maintains a three-month rolling roadmap alongside the monthly release cadence. The roadmap provides a current view of the next three planned minor release cycles, including:
- planned feature themes and notable work for each release,
- expected code-complete dates, validation windows, and final release targets,
- known schedule or dependency risks, and
- work that moved into or out of a release since the previous update.
The roadmap is refreshed at least monthly, normally after the current release cycle advances. It is planning guidance rather than a release guarantee. Scope or dates may change as priorities shift, dependencies change, or QA findings require additional work.
Patch releases
Patch releases increment Z within an existing vX.Y release line. They are
published as needed for fixes that should not wait for the next monthly minor
release, such as a security fix, production-blocking defect, regression, or
other significant issue.
Each patch goes through validation appropriate to its changes:
- NVIDIA prepares a
vX.Y.Z-rcNpatch candidate. - QA validates the candidate source and artifacts, including the affected regression and upgrade paths when applicable.
- Any candidate change receives a new RC number and the affected validation is repeated.
- After approval, NVIDIA merges the validated patch content publicly and
publishes the final
vX.Y.Zrelease.
Patch releases do not have a fixed cadence and may be published between monthly minor releases when the fix and validation are ready.
Backward compatibility
Breaking changes to guaranteed public interfaces are not allowed within an RMS application major version.
Deprecation and breaking-change notice
A guaranteed public interface may be deprecated before a future breaking change, but deprecation is a warning rather than removal. The deprecated interface remains functional for the rest of the current major version.
Removing a guaranteed public interface, or changing its behavior incompatibly, requires a future major release. NVIDIA announces the change in the release notes and the three-month rolling roadmap and provides a replacement or migration path when one is available.
When practical, a deprecated interface also produces an operator-visible warning through API status, command output, logs, or release notes. The minimum notice for a breaking change is one full three-month roadmap window before the release that introduces it. Emergency exceptions for security, data corruption, or similarly severe issues are identified explicitly in the release notes.
Guaranteed public interfaces
The RMS application major version governs compatibility for these documented, public-facing interfaces:
- the northbound
RackManagergRPC API, including its RPCs and protobuf contracts, - documented user-facing command-line interfaces shipped with RMS,
- documented RMS configuration files, and
- documented environment variables consumed by RMS.
Within a major version, existing clients and configurations can continue using these interfaces. New optional functionality may be added in a backward-compatible way.
The Helm chart has an independent MAJOR.MINOR.PATCH version. Compatibility of
documented Helm values and templates is governed by the chart major version,
not the RMS application major version. A breaking value rename or removal, or a
removed template, requires a new chart major version. Chart and RMS major
versions do not need to match. See Kubernetes deployment
versioning for the two version axes.
Interfaces not covered by the guarantee
The following implementation details may change between releases without the same compatibility commitment:
- internal Rust crate APIs and component boundaries,
- undocumented development, test, debug, or administrative tools,
- internal database schemas and persistence formats,
- internal communication contracts between RMS components, and
- implementation details of southbound hardware integrations.
Consumers should use the documented public interfaces rather than depending on these internal details.
Release artifacts and notes
RMS releases can contain artifacts with independent version lifecycles. The release record identifies the exact relationship between the published release and each applicable artifact, including:
- the RMS application tag and final commit,
- the container image digest,
- the independently versioned Helm chart version,
- the bundled or separately published NVFWUPD version,
- the compatible NICo version or version range, and
- the software bill of materials (SBOM) or its published location.
Compatibility is determined by the release record and validation evidence, not by artifacts having similar publication dates.
Release notes include, as applicable:
- the release version, date, baseline, and final commit,
- user- and operator-visible changes, including compatibility changes,
- supported hardware and integration changes,
- the exact artifact versions and digests listed in the release record,
- upgrade instructions, data-migration effects, and downgrade limitations,
- known issues, workarounds, deferred validation, and documented exceptions, and
- the QA approval state and SBOM location.
Publication guarantees
For each RMS release, NVIDIA will:
- publish only content approved for public release,
- base the public merge on the exact release candidate accepted by QA,
- require the public repository’s normal checks and review before merge, and
- retain a release record containing the immutable release-candidate tag and commit, final release tag and commit, published artifact digests, and QA approval record.
This process keeps the public repository aligned with releases that have completed NVIDIA validation and makes each published version traceable to the candidate accepted by QA.
Summary
NVIDIA targets a monthly public minor release and publishes validated patch releases as needed. QA approves the exact candidate before publication, and the release record links that candidate to the final artifacts. The rolling roadmap and major-version compatibility policy give users advance notice of planned and breaking changes.