NVIDIA Mission Control DGX SuperPOD Ethernet North-South Network Configuration Guide#
Guide map#
Use the following quick links to navigate each section of this guide:
Introduction - Scope, assumptions, and baseline context for GB200/GB300 North-South network deployment.
Networking Planning and Design - Logical design, subnet allocations, and edge handoff patterns.
Network Provisioning Workflow - Two-stage automation workflow, required inputs, and generated outputs.
Input File Format Requirements (Manifest) - Required schemas and format rules for SiteInfo, P2P, and inventory files.
Pre-Network Bringup - Pre-run checklist and readiness gates before onsite fabric bringup.
BCM Bootstrap Workflow - Ordered BCM bootstrap actions, checkpoints, and expected artifacts.
NVLink Switch Bringup Workflow - NVLink switch connectivity, bootstrap sequence, and verification flow.
Network Validation for North-South Network - Post-bringup underlay/overlay, health, and reachability validation checks.
Glossary of Terms - Definitions for key terminology used throughout this guide.