For AI agents: a documentation index is available at the root level at /llms.txt and /llms-full.txt. Append /llms.txt to any URL for a page-level index, or .md for the markdown version of any page.
    • NVIDIA Switch Infrastructure
    • I want to...
  • Quick Start
    • Start Here
    • Getting Started with Config Manager
    • TUI Wizard Reference
    • Configuration Samples
    • Interfaces
    • Local Development Quick Start
    • First Run Tour
  • Config Manager Overview
    • Config Manager Concepts
    • Getting Started with Nautobot
  • User Guides
    • New Site Bringup
    • Workflow Lifecycle
  • Deployment
    • Hosting Options
    • Network Topology Requirements
    • Firewall Ports
    • Airgapped Deployment
    • Troubleshooting
  • Services
      • Network Infrastructure Automation with Temporal
      • Temporal Deployment Process
      • Temporal CLI
      • Workflows for Day 2 Operations
        • BMC Provisioning
        • Configuration Backup
        • Configuration Deploy
        • Connected Host Metadata
        • Device Cable Validation
        • Device Password Rotation
        • Device Reprovisioning
        • Hardware Validation
        • InfiniBand Cable Validation
        • Infiniband Get Unhealthy Ports
        • Infiniband MLNX OS Upgrade
        • Multi-Deploy Workflow
        • NVLink Switch Firmware Upgrade
        • Port LLDP Info
        • Site Cable Validation
        • Site Password Rotation
        • Switch OS Upgrade
        • VPC Creation
        • VPC Deletion
      • Temporal API
NVIDIANVIDIA
Developer-friendly docs for your API
Privacy Policy | Your Privacy Choices | Terms of Service | Accessibility | Corporate Policies | Product Security | Contact

Copyright © 2026, NVIDIA Corporation.

LogoLogo
On this page
  • User Interface
  • Form Inputs
  • Workflow Execution
  • Execution Stages
ServicesTemporal ServiceWorkflows for Day 2 Operations

Switch OS Upgrade

||View as Markdown|
Previous

Site Password Rotation

Next

VPC Creation

Upgrades the operating system on network switches with automated backup, deployment, and validation procedures.

This workflow does not support NVLink and NVLink Switches. See the NVLink Switch Firmware Upgrade workflow for details on NVLink upgrades.

User Interface

Form Inputs

FieldDescriptionSelection TypeRequired
SiteChoose the site containing the switchSingle dropdown from available sitesYes
DeviceSelect the switch to upgradeSingle dropdown from switches in selected siteYes

Workflow Execution

Execution Stages

  1. Pre-upgrade preparation
  2. Deploy OS image
  3. Perform system upgrade
  4. Post-upgrade validation